You don't have javascript enabled. Good luck with that.
Pencarian
Banjir di Jaktim Akibat Infrastruktur Tak Memadai

Floods in E. Jakarta is Due to Poor Infrastructure

East Jakarta Administration, already anticipating the weather anomalies that predict pretty extreme over three days ahead. However, infrastructure such as water channel is not yet fully ready.

Floods happen this time is due to infrastructure, such as water channel that cannot accommodate the high flow of water

Mayor of East Jakarta, Bambang Musyawardana disclosed, in terms of human handling during floods, the region is ready. This is because related unit is also ready, such as urban village head, sub-district head until Regional Disaster Mitigation Agency (BPBD).

Due to Rob, Flood Continues to Inundate Muara Baru

"Floods happen this time is due to infrastructure, such as water channel that cannot accommodate the high flow of water. Whereas, garbage and mud are clean, because it has been cleaned by PPSU," he disclosed, Tuesday (6/21).

As in Cipinang River in Kampung Rambutan RW 03, was been installed with sheet pile and dike. Because of the low bridge position, it causes overflowing water from the river. Thus it needs to be elevated. While in Kampung Makasar, flood still often occurs because the river cannot accommodate the high flow of water.

Bambang assessed, flood is also due to human-caused greedy and careless. Even, the water absorption areas and riverbanks has become a dwelling.

"Automatically, the water will find the lower land, such as residential areas," he finished.

Linked News
Popular News indeks
  1. Jakarta Removes Gibran’s Portraits Across All Government Offices

    access_time16-11-2026 remove_red_eye1209 personFakhrizal Fakhri
  2. Welcoming BTS's Concert in December 2026, Jakarta is Dressed in Purple

    access_time16-11-2026 remove_red_eye512 personFakhrizal Fakhri
  3. 32 School Basketball Teams to Compete in Teladan Cup 2026

    access_time15-11-2026 remove_red_eye407 personBudhi Firmansyah Surapati
  4. Jakarta Hosts 2026 UCWDC Asian Championship with 280 Dancers from Five Countries

    access_time20-11-2026 remove_red_eye395 personBudhi Firmansyah Surapati
  5. Transjakarta - NIR Sweden Partner to Build Electric Bus Capabilities

    access_time18-11-2026 remove_red_eye381 personAldi Geri Lumban Tobing